Management of Variations and Claims (Cost and Time) Under the FIDIC Contracts

25 & 26 April 2016

====================================

Course Outline
====================================

Introduction
Definition and differences
Proper documentation in place
What is the Variation

Definition
Variation sources
Variation after the issuance of the Taking over Certificate.
Value Engineering
Scope of work between Lump Sum and Re-measured Contract
BOQ rates between Lump Sum and Re-measured Contract
Variation Procedure
BQQ rates and prices
Fixing the rates based on the BOQ
Introducing new rates
Omission
Substantiation
Breakdown of Lump Sum Item
Variation Determination

Engineer's Authority to fix the rate
Applicable rates
Due Consultation
Variations exceeding 20%
Adjustment of rates
Adjustment for change in cost
Adjustment for change in legislation
Day work

Provisional Sum
Definition of Provisional Sum
Use of Provisional Sum
Nominated Subcontractors

Definition of "nominated Subcontractor"
Objection to Nomination
Payments to nominated Subcontractors
Evidence of Payments
Claim Management

What is the Claim
Risk allocation and management
Contractor's Claim
Claim Procedure
Claim Time Bar
Notification of Claims
Submission of Particulars
Failure to submit
Engineer's assessment and principles of claim
Engineers valuation
Engineer's determination, Clause 3.5
Payment of Claim
Employer's Claim
Claim Procedure
Claim Time Bar
Notifications of Claims
Submission of Particulars
Failure to submit
Engineer's assessment and principles of claim
Engineers valuation
Engineer's determination, Clause 3.5
Payment of Claim
Interim submission
Programme

Base Line
Revised Programme
Recovery Programme
Programme update
Time Extension

When the time can be extended
Procedure of submission

Loading the events to the Base Line Programme
Cause and Effect Analysis
Claim Substantiation
The impact of absence of the approved Programme
Prolongation cost

What is Prolongation Cost
Prolongation Cost calculation
Penalties or Liquidated Damages

Disputes and Arbitration
Disputes
Amicable Settlement
Dispute Adjudication Board
Arbitration


====================================